Project Details
R.J. Forbes worked as a subcontractor to Power and Construction Group to coat a new concrete transformer foundation and secondary containment in Rochester, New York. The scope covered the interior floors and walls with a high-performance coating system.
Project Challenge
New concrete required preparation to remove laitance and create a profile for coating adhesion. Rain and changing weather also had to be kept out of the work area, while abrasive media needed to remain contained. Maintaining dry conditions was essential to the preparation and application sequence.
Project Solution
Following the foundation pour, the team established weather containment and installed dehumidifiers to maintain a dry working environment. We abrasive blasted the concrete to remove surface laitance and develop the required profile, then filled bug holes to prepare the surface for coating.
Our crew applied Carboline Reactamine 760 using plural-component equipment. After application, we cleaned the work area and demobilized, leaving the new foundation and secondary containment with its specified protective coating system.
This transformer containment coating project brings together abrasive blasting, secondary containment coatings, plural component spray application for the power generation sector.