Project Details / Client Story
When Great Wolf Lodge needed precise paint touch-ups on their interior mechanical systems, they called on RJ Forbes for our expertise and reliability. The project required careful coordination with the General Contractor and facility staff to ensure all work was performed safely and efficiently in a busy, operational resort environment.
Our team utilized man lifts and full PPE to access hard-to-reach areas, applying high-performance coatings to mechanical systems for both protection and aesthetics. During the final walkthrough, a drone inspection revealed a few minor spots needing additional attention. We took full accountability, quickly addressed the touch-ups, and ensured every detail met our standards.
At the end, everyone was satisfied—and the General Contractor shared, “They won’t be hesitating to hire us in the future.” This project is a testament to our commitment to quality, safety, and building lasting relationships.
Project Challenge
Performing detailed mechanical system touch-ups in an active resort environment required:
- Coordinating with multiple stakeholders and scheduling around guest activity
- Accessing difficult areas using man lifts and advanced safety equipment
- Ensuring all coatings matched existing finishes and provided long-term protection
Project Solution
RJ Forbes delivered:
- Careful surface preparation and cleaning of mechanical system surfaces
- Application of high-performance coatings for durability and aesthetics
- Use of man lifts and PPE to ensure worker safety and minimize disruption
- Responsive follow-up, including drone-assisted inspections and immediate touch-up of any missed areas















































