Project Details
R.J. Forbes installed a custom fiberglass-reinforced plastic (FRP) liner within an existing generator containment for Ethos Energy in Waterbury. The work combined concrete preparation and wet hand layup to provide containment for future oil leaks or spills.
Project Challenge
The existing containment was bare concrete with signs of contamination from earlier oil exposure. That condition made adhesion of a standard coating difficult. The solution needed to fit the existing floor and walls while maintaining its position without relying solely on a bond to the contaminated substrate.
Project Solution
Our team first pressure washed the concrete, then mechanically ground the surface to remove laitance and contamination in the upper layer. Using the existing containment as a mold, we installed a five-layer Dudick FRP liner by wet hand layup.
Once the liner cured, we mechanically anchored its perimeter with concrete anchors. This helped maintain the liner’s position independently of adhesion to the underlying concrete. The completed work provided a liner formed to the existing containment and designed to hold future oil leaks or spills.
This generator containment FRP lining project brings together pressure washing and water jetting, concrete grinding, secondary containment coatings for the power generation sector.