Keeping Water Available: Emergency Leak Repair on an Elevated Storage Tank

View all projects

Project Details

R.J. Forbes responded to an active leak at an abandoned manway on a municipal elevated water storage tank. The project required a staged repair that would keep the tank available during high demand, followed by a permanent welded repair during a coordinated shutdown.

Project Challenge

Rainwater trapped behind the old manway clamp had caused corrosion at the joint between the hatch cover and gasket seat, eventually penetrating the steel. The location made access to the damage difficult. At the same time, local water demand prevented the client from immediately isolating and draining the tank.

Project Solution

We applied a temporary patch using Belzona steel-bonding repair composite to slow the leak and allow continued use until an outage could be scheduled. Once the tank was isolated, our crew drained the remaining water, removed the entire abandoned manway, and welded a new steel plate into place.

After inspection of the welding work, we abrasive blasted the new steel and the transition onto the existing surface to establish a coating profile. An NSF coating completed the repair, protecting the steel from future corrosion. The staged approach addressed the immediate leak while allowing the permanent work to follow the client’s operating schedule.

This elevated water tank leak repair project brings together composite repair, storage tank restoration, abrasive blasting, epoxy and urethane coatings for the water, wastewater systems, and infrastructure sector.

Project Gallery

Portfolio

View some of our client's projects

Trusted by 100s of industry-leading companies & organizations

Testimonials

Our customers love our work's quality and pricing.

See what our customers are saying...

Testimonials

Our customers love our work's quality and pricing.

View all
Ready to chat? Tap to call